{"id":145,"date":"2026-07-17T09:32:43","date_gmt":"2026-07-17T09:32:43","guid":{"rendered":"https:\/\/www.deltafirst.co.uk\/blog\/mechanical-services-in-a-building-uk-compliance-guide\/"},"modified":"2026-07-17T21:39:22","modified_gmt":"2026-07-17T21:39:22","slug":"mechanical-services-in-a-building-uk-compliance-guide","status":"publish","type":"post","link":"https:\/\/www.deltafirst.co.uk\/blog\/mechanical-services-in-a-building-uk-compliance-guide\/","title":{"rendered":"Mechanical services in a building: UK compliance guide"},"content":{"rendered":"<\/p>\n<p>Mechanical services in a building are the engineered systems that maintain heating, ventilation, air conditioning, plumbing, lifts, and related infrastructure across a property. In the UK, these systems are governed by four primary statutory regimes: LOLER, PUWER, PSSR, and COSHH, all operating under the Health and Safety at Work etc. Act 1974. Facilities managers and property owners who fail to meet these obligations face enforcement action, civil liability, and the very real risk of equipment failure injuring occupants. The industry term for the discipline covering these systems is \u201cbuilding mechanical services,\u201d and understanding how compliance, maintenance, and asset management interact is the foundation of safe, efficient building operation.<\/p>\n<h2 id=\"what-are-the-main-statutory-compliance-requirements-for-mechanical-services-in-uk-buildings\">What are the main statutory compliance requirements for mechanical services in UK buildings?<\/h2>\n<p><img decoding=\"async\" src=\"https:\/\/csuxjmfbwmkxiegfpljm.supabase.co\/storage\/v1\/object\/public\/blog-images\/organization-42102\/1784034568247_Infographic-summarizing-UK-mechanical-compliance-regulations.jpeg\" alt=\"Infographic summarizing UK mechanical compliance regulations\"><\/p>\n<p><a href=\"https:\/\/seis.engineering\/regulations\/\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">UK mechanical compliance<\/a> is governed by four regulations that each target a different category of mechanical plant. Knowing which regime applies to which system prevents costly gaps in your compliance programme.<\/p>\n<p><strong>LOLER (Lifting Operations and Lifting Equipment Regulations 1998)<\/strong> covers cranes, passenger lifts, goods hoists, and any equipment used to lift people or loads. LOLER mandates thorough examinations every 6\u201312 months, depending on whether the equipment carries people. These examinations must be carried out by a competent, independent person with the authority to quarantine unsafe plant.<\/p>\n<p><strong>PUWER (Provision and Use of Work Equipment Regulations 1998)<\/strong> is the broadest of the four. It applies to virtually all mechanical work equipment, from pumps and fans to boilers and compressors. PUWER inspections are risk-based without fixed statutory intervals, which means the frequency must be justified by a documented risk assessment rather than a calendar date.<\/p>\n<p><strong>PSSR (Pressure Systems Safety Regulations 2000)<\/strong> applies to boilers, pressurised pipework, and pressure vessels. Before any pressure system is put into use, a written scheme of examination must be in place, prepared or approved by a competent person. The scheme defines what gets inspected, how often, and by whom.<\/p>\n<p><strong>COSHH (Control of Substances Hazardous to Health Regulations 2002)<\/strong> requires that local exhaust ventilation (LEV) systems, such as kitchen extract hoods and laboratory fume cupboards, are tested every 14 months. The test must be documented and records retained.<\/p>\n<table>\n<thead>\n<tr>\n<th>Regulation<\/th>\n<th>Systems covered<\/th>\n<th>Inspection interval<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>LOLER<\/td>\n<td>Lifts, hoists, cranes<\/td>\n<td>Every 6\u201312 months<\/td>\n<\/tr>\n<tr>\n<td>PUWER<\/td>\n<td>General work equipment<\/td>\n<td>Risk-based, no fixed interval<\/td>\n<\/tr>\n<tr>\n<td>PSSR<\/td>\n<td>Boilers, pressure vessels<\/td>\n<td>Per written scheme of examination<\/td>\n<\/tr>\n<tr>\n<td>COSHH (LEV)<\/td>\n<td>Extraction and ventilation<\/td>\n<td>Every 14 months<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A critical distinction exists between a statutory examination and routine maintenance. Statutory examinations must be performed by a competent, independent examiner. That person must be free from commercial pressure to pass equipment. Routine maintenance, by contrast, is carried out by your service contractor and keeps equipment running. The two activities are complementary but legally separate.<\/p>\n<p><strong>Pro Tip:<\/strong> <em>Keep statutory examination certificates and maintenance service records in separate folders within your compliance system. Auditors and insurers treat them differently, and mixing them creates confusion during inspections.<\/em><\/p>\n<h2 id=\"how-can-asset-led-maintenance-improve-mechanical-services-management\">How can asset-led maintenance improve mechanical services management?<\/h2>\n<p>Most facilities managers assume statutory compliance means booking annual checks on a fixed calendar. <a href=\"https:\/\/allservices4u.co.uk\/planned-preventive-maintenance\/mechanical-systems-ppm\/\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">UK law focuses on risk-based assessment<\/a> mapped to actual asset use and manufacturer guidance, not generic schedules. That distinction changes how you plan and budget maintenance across your entire building.<\/p>\n<p>Asset-led maintenance starts by cataloguing every mechanical asset, recording its age, manufacturer service intervals, duty cycle, and the statutory regime it falls under. A rooftop air handling unit running 24 hours a day in a hospital needs more frequent attention than an identical unit in an office running eight hours a day, five days a week. Treating them identically wastes money on one and creates risk on the other.<\/p>\n<p>The practical benefits of an asset-led approach include:<\/p>\n<ul>\n<li><strong>Cost control.<\/strong> Maintenance visits are timed to actual need, reducing unnecessary call-outs and parts replacement.<\/li>\n<li><strong>Risk reduction.<\/strong> High-duty or safety-critical assets receive more attention before they fail.<\/li>\n<li><strong>Audit-ready records.<\/strong> Every task is tied to a specific asset, a regulatory trigger, or a manufacturer recommendation, giving you a defensible paper trail.<\/li>\n<li><strong>Statutory alignment.<\/strong> LOLER, PUWER, and PSSR triggers are built into the asset schedule, so nothing is missed.<\/li>\n<\/ul>\n<p>A Computerised Maintenance Management System (CMMS) is the standard tool for managing this complexity. <a href=\"https:\/\/www.trefnus.com\/post\/uk-fm-statutory-compliance-every-check-frequency-and-law-you-need-to-know\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">Treating compliance as a planned discipline<\/a> managed through a CMMS reduces compliance risk and produces defensible reporting for insurers, regulators, and senior management. A CMMS links each asset to its maintenance history, upcoming tasks, and statutory certificates in one searchable record.<\/p>\n<p><strong>Pro Tip:<\/strong> <em>When setting up a CMMS, import your statutory examination due dates first. Build preventive maintenance tasks around those fixed compliance anchors rather than the other way around. This prevents scheduling conflicts and missed statutory deadlines.<\/em><\/p>\n<p>Deltafirst supports clients in building <a href=\"https:\/\/deltafirst.co.uk\/why\/full-compliance-management.html\" target=\"_blank\" rel=\"noopener\">integrated compliance management<\/a> frameworks that connect planned preventive maintenance (PPM) with statutory examination schedules across all mechanical systems.<\/p>\n<h2 id=\"what-are-the-critical-mechanical-building-systems-and-their-compliance-needs\">What are the critical mechanical building systems and their compliance needs?<\/h2>\n<p>Building mechanical systems each carry distinct compliance obligations. Understanding them by system type makes it easier to assign responsibility and plan resources.<\/p>\n<h3 id=\"hvac-systems\">HVAC systems<\/h3>\n<p>HVAC is the most complex compliance area in building mechanical services. Engineers handling fluorinated refrigerants must hold <a href=\"https:\/\/contractorvault.co.uk\/trades\/hvac-engineer\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">F-Gas Category I certification<\/a> and their company must be registered with REFCOM or Quidos. This is a legal requirement under UK F-Gas regulations, not an optional quality standard.<\/p>\n<p>Ductwork commissioning records are equally critical. Missing ductwork pressure test results to the DW\/143 standard, or absent refrigerant charge logs, delay building sign-off and create failures under Building Regulations Part L (energy efficiency) and Part F (ventilation). Facilities managers inheriting a building should request these documents at handover and chase them if they are absent.<\/p>\n<p>Routine HVAC maintenance covers filter changes, coil cleaning, belt inspections, and drain checks. These tasks are separate from statutory LEV testing under COSHH and from any PUWER risk assessment the equipment may require.<\/p>\n<h3 id=\"lifts-and-lifting-equipment\">Lifts and lifting equipment<\/h3>\n<p>Lift servicing and LOLER thorough examinations are two different contractual obligations. A lift maintenance contract keeps the equipment running. A LOLER examination, carried out by an independent competent person, confirms the equipment is safe to use. Both are required. Facilities managers sometimes assume the maintenance contractor also fulfils the LOLER obligation. That is only the case if the contractor is genuinely independent of the maintenance relationship and holds the relevant competency.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/csuxjmfbwmkxiegfpljm.supabase.co\/storage\/v1\/object\/public\/blog-images\/organization-42102\/1784033038684_Lift-machinery-room-with-inspection-equipment-and-tools.jpeg\" alt=\"Lift machinery room with inspection equipment and tools\"><\/p>\n<h3 id=\"boilers-and-pressure-systems\">Boilers and pressure systems<\/h3>\n<p>Boilers require annual safety servicing by a Gas Safe registered engineer, plus a PSSR written scheme of examination covering the pressure vessel and associated pipework. Water quality management, including legionella risk assessment and treatment under the HSE\u2019s Approved Code of Practice L8, sits alongside these obligations. Neglecting water treatment in a heating system accelerates corrosion and creates a public health risk.<\/p>\n<h3 id=\"building-management-systems-bms\">Building Management Systems (BMS)<\/h3>\n<p>A BMS controls and monitors HVAC, lighting, and other building systems from a central interface. Regular checks of BMS controls, alarm setpoints, and sensor calibration are not statutory requirements in themselves, but they directly affect whether HVAC systems operate within the parameters required by Part L and Part F. A BMS that drifts out of calibration can cause a compliant system to operate non-compliantly without triggering any obvious fault.<\/p>\n<h2 id=\"how-to-coordinate-mechanical-services-compliance-efficiently\">How to coordinate mechanical services compliance efficiently<\/h2>\n<p>Coordinating compliance across multiple systems and regimes is where many facilities managers lose control. The solution is a single accountable framework that consolidates every obligation into one managed programme.<\/p>\n<ol>\n<li><strong>Audit your assets.<\/strong> List every mechanical system in the building, its age, its statutory regime, and its last examination date. This audit is the foundation of everything else.<\/li>\n<li><strong>Build a compliance calendar.<\/strong> Map every statutory due date, from LOLER examinations to COSHH LEV tests, into a single forward-looking schedule. Include contractor report deadlines and certificate renewal dates.<\/li>\n<li><strong>Assign clear ownership.<\/strong> Every compliance task needs a named responsible person, whether internal or contracted. Ambiguity about who books the LOLER examination is how examinations get missed.<\/li>\n<li><strong>Consolidate records.<\/strong> Many statutory examinations are coordinated through engineering insurance inspection schemes that bundle obligations for pressure vessels, boilers, and lifts into one managed programme. This simplifies record management considerably.<\/li>\n<li><strong>Track remedial actions.<\/strong> When an examination identifies a defect, the remedial action must be recorded and closed out within the timeframe specified by the examiner. Open defects with no closure date are a significant liability in any enforcement investigation.<\/li>\n<\/ol>\n<p><a href=\"https:\/\/www.smartqhse.com\/safety-blog\/complete-guide-hse-uk\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">HSE guidance<\/a> is advisory, but courts use it as a benchmark. Failing to follow relevant HSE guidance without a documented safer alternative increases legal exposure. That means your compliance records need to show not just that tasks were completed, but that they were completed in line with recognised standards.<\/p>\n<p><strong>Pro Tip:<\/strong> <em>Where PUWER and LOLER both apply to the same piece of equipment, such as a powered access platform, document both assessments in the same asset record. Auditors expect to see them together, and it reduces the risk of one being overlooked.<\/em><\/p>\n<p>Deltafirst provides <a href=\"https:\/\/deltafirst.co.uk\/why\/transparent-reporting.html\" target=\"_blank\" rel=\"noopener\">transparent reporting<\/a> to clients, giving facilities managers clear, auditable evidence of every maintenance visit and statutory examination across their mechanical estate.<\/p>\n<h2 id=\"key-takeaways\">Key takeaways<\/h2>\n<p>Effective mechanical services management requires integrating statutory compliance, asset-led maintenance, and auditable record-keeping into a single coordinated programme.<\/p>\n<table>\n<thead>\n<tr>\n<th>Point<\/th>\n<th>Details<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Four statutory regimes apply<\/td>\n<td>LOLER, PUWER, PSSR, and COSHH each govern different mechanical systems with distinct inspection requirements.<\/td>\n<\/tr>\n<tr>\n<td>Asset-led beats fixed schedules<\/td>\n<td>Maintenance intervals mapped to actual use and manufacturer guidance reduce cost and improve risk control.<\/td>\n<\/tr>\n<tr>\n<td>Examinations and maintenance differ<\/td>\n<td>Statutory examinations require an independent competent person; routine maintenance does not fulfil this obligation.<\/td>\n<\/tr>\n<tr>\n<td>CMMS centralises compliance<\/td>\n<td>A Computerised Maintenance Management System links assets, tasks, and certificates into one auditable record.<\/td>\n<\/tr>\n<tr>\n<td>Handover documents matter<\/td>\n<td>Missing ductwork pressure tests or refrigerant charge logs create compliance failures under Building Regulations Part L and Part F.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"what-i-have-learned-from-years-of-mechanical-compliance-work\">What I have learned from years of mechanical compliance work<\/h2>\n<p>The single most persistent problem I see in commercial buildings is facilities managers treating statutory examinations and maintenance contracts as interchangeable. They are not. A lift maintenance contract keeps the doors opening. A LOLER thorough examination confirms the equipment is legally safe to operate. Conflating the two creates a gap that only becomes visible when something goes wrong, at which point the liability question becomes very uncomfortable.<\/p>\n<p>The second issue is record-keeping at handover. Buildings change hands, contractors change, and commissioning documents get lost. When a facilities manager cannot produce the ductwork pressure test results or the refrigerant charge log for a system installed three years ago, they are effectively starting from scratch on compliance. The cost of reconstructing that evidence is always higher than the cost of capturing it properly at the outset.<\/p>\n<p>My strongest recommendation is to adopt a risk-based, asset-led regime from day one. Generic annual checklists feel safe because they are familiar, but they do not reflect how equipment actually ages or fails. A CMMS that maps maintenance to real asset data gives you a defensible position with the HSE, your insurer, and your board. Engaging a single, accountable provider who understands all four statutory regimes, rather than managing four separate contractors, removes the coordination risk that causes compliance gaps.<\/p>\n<blockquote>\n<p><em>\u2014 Ashley<\/em><\/p>\n<\/blockquote>\n<h2 id=\"deltafirst-mechanical-compliance-and-maintenance-across-the-uk\">Deltafirst: mechanical compliance and maintenance across the UK<\/h2>\n<p>Facilities managers and property owners across Essex, Suffolk, Cambridgeshire, Norfolk, and Greater London trust Deltafirst to keep their buildings compliant and operational.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/csuxjmfbwmkxiegfpljm.supabase.co\/storage\/v1\/object\/public\/blog-images\/organization-42102\/1783116648075_deltafirst.jpg\" alt=\"https:\/\/deltafirst.co.uk\"><\/p>\n<p>Deltafirst delivers <a href=\"https:\/\/deltafirst.co.uk\" target=\"_blank\" rel=\"noopener\">planned preventive maintenance<\/a> programmes covering HVAC, lifts, boilers, pressure systems, and building fabric, all coordinated within a single compliance-led framework. Our qualified engineers hold the certifications required for F-Gas, Gas Safe, and LOLER-related work, and we produce clear, auditable reports after every visit. Whether you manage a <a href=\"https:\/\/deltafirst.co.uk\/sectors\/commercial-offices.html\" target=\"_blank\" rel=\"noopener\">commercial office portfolio<\/a>, an education estate, or a healthcare facility, Deltafirst can survey your mechanical assets and build a maintenance programme that meets your statutory obligations. Contact us to request a quotation or a planned maintenance survey.<\/p>\n<h2 id=\"faq\">FAQ<\/h2>\n<h3 id=\"what-are-mechanical-services-in-a-building\">What are mechanical services in a building?<\/h3>\n<p>Mechanical services in a building are the engineered systems that provide heating, ventilation, air conditioning, plumbing, lifts, and related infrastructure. They are governed in the UK by LOLER, PUWER, PSSR, and COSHH regulations.<\/p>\n<h3 id=\"how-often-does-lifting-equipment-need-a-statutory-examination\">How often does lifting equipment need a statutory examination?<\/h3>\n<p>LOLER requires thorough examinations every 6\u201312 months for lifting equipment, with the shorter interval applying to equipment that carries people, such as passenger lifts.<\/p>\n<h3 id=\"what-is-the-difference-between-a-loler-examination-and-a-lift-maintenance-contract\">What is the difference between a LOLER examination and a lift maintenance contract?<\/h3>\n<p>A lift maintenance contract covers routine servicing to keep equipment operational. A LOLER thorough examination is a statutory inspection carried out by an independent competent person to confirm the equipment is safe to use. Both are legally required.<\/p>\n<h3 id=\"does-hvac-equipment-require-f-gas-certification\">Does HVAC equipment require F-Gas certification?<\/h3>\n<p>Any engineer handling fluorinated refrigerants in HVAC systems must hold F-Gas Category I certification, and their employer must be registered with REFCOM or Quidos. This is a legal requirement under UK F-Gas regulations.<\/p>\n<h3 id=\"how-should-facilities-managers-store-mechanical-compliance-records\">How should facilities managers store mechanical compliance records?<\/h3>\n<p>Statutory examination certificates, maintenance service records, and remedial action logs should be held in a CMMS or equivalent system, linked to individual assets. Records must be available for inspection by the HSE, insurers, and enforcement authorities at any time.<\/p>\n<h2 id=\"recommended\">Recommended<\/h2>\n<ul>\n<li><a href=\"https:\/\/deltafirst.co.uk\/sectors\/residential.html\" target=\"_blank\" rel=\"noopener\">Building Services for Residential Developments | Delta First Building Services<\/a><\/li>\n<li><a href=\"https:\/\/deltafirst.co.uk\/sectors\/commercial-offices.html\" target=\"_blank\" rel=\"noopener\">Building Services for Commercial Offices | Delta First Building Services<\/a><\/li>\n<li><a href=\"https:\/\/deltafirst.co.uk\/sectors\/healthcare-nhs.html\" target=\"_blank\" rel=\"noopener\">Building Services for Healthcare &amp; NHS | Delta First Building Services<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Discover vital compliance rules for mechanical services in a building. Ensure safety, efficiency, and risk management in UK properties.<\/p>\n","protected":false},"author":2,"featured_media":147,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[7,4],"tags":[346,349,347,46,293,336,55,339,343,52,94,37,101,342,345,252,239,340,337,162,338,43,164,44,125,341,350,344,348,185],"class_list":["post-145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-compliance","category-mechanical","tag-air-conditioning","tag-bms","tag-boiler-maintenance","tag-building-maintenance","tag-building-management-systems","tag-building-mechanical-services","tag-building-services","tag-commercial-buildings","tag-commercial-hvac","tag-commercial-property-maintenance","tag-delta-first","tag-facilities-management","tag-fm-services","tag-health-and-safety-compliance","tag-heating-systems","tag-hvac-systems","tag-maintenance-contractors","tag-mechanical-compliance","tag-mechanical-engineering","tag-mechanical-services","tag-mep-services","tag-planned-preventative-maintenance","tag-plumbing-services","tag-ppm","tag-statutory-compliance","tag-uk-building-regulations","tag-uk-compliance-guide","tag-ventilation-systems","tag-water-systems","tag-workplace-safety"],"blocksy_meta":[],"uagb_featured_image_src":{"full":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents.jpeg",1279,720,false],"thumbnail":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents-150x150.jpeg",150,150,true],"medium":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents-300x169.jpeg",300,169,true],"medium_large":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents-768x432.jpeg",768,432,true],"large":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents-1024x576.jpeg",1024,576,true],"1536x1536":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents.jpeg",1279,720,false],"2048x2048":["https:\/\/www.deltafirst.co.uk\/blog\/wp-content\/uploads\/2026\/07\/1784032916747_Engineer-reviewing-mechanical-plant-compliance-documents.jpeg",1279,720,false]},"uagb_author_info":{"display_name":"Delta First Editorial Team","author_link":"https:\/\/www.deltafirst.co.uk\/blog\/author\/deltaeditor\/"},"uagb_comment_info":12,"uagb_excerpt":"Discover vital compliance rules for mechanical services in a building. Ensure safety, efficiency, and risk management in UK properties.","_links":{"self":[{"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/posts\/145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=145"}],"version-history":[{"count":1,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/posts\/145\/revisions"}],"predecessor-version":[{"id":146,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/posts\/145\/revisions\/146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/media\/147"}],"wp:attachment":[{"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.deltafirst.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}